NHS MORTUARY COLDROOM
FROM ENQUIRY TO HAND OVER
DAIRY FARM PEAK DISTRICT
FREEZER COLD ROOM
DESIGN, SUPPLY, INSTALLATION -22 ICE CREAM STORAGE ROOM
BOLTON BUTCHERS COUNTER
SMEVA CABINET
Smeva refrigerarted butchers serve over counter, previous visit had located refrigerant gas leaks on the copper pipes, under the stainless steel deck. To keep the customer operational, repairs were undertaken. A new counter would have take 6-8 weeks from design approval, this is the lengths we are able to goto and want to.
MANCHESTER ABATTOIR
REPLACEMENT REFRIGERATION SYSTEMS
30 YEAR OLD REFRIGERATION EQUIPMENT REMOVED AND REPLACED WITH MODERN EFFICIENT EQUIPMENT
NHS Stockport
Temperature Monitoring Systems
Temperature monitoring station, with web access, 365 days data recorded, battery back up & auto dial facility.
Using Thermomax data systems as a cost effective solution



NATIONAL BAKERY SUPPLIER MANCHESTER
STORAGE COLD ROOM
A new cold room was commissioned due to expanding orders and larger need fo capacity in the future. A twin 100% back up refrigeration design was applied, with a rotation control panel. 60 meter pipes runs also provided a challenge for selection of condensing units.
Searle Evaporators with BLYGOLD spray covering were used for extra evaporator protection in a harsh environment.
MANCHESTER OFFICE SUITES
HEAT PUMP AIR CONDITIONING
This site previously had air conditioning system, legislation change with refrigerant R22 gas has made the customer update to high efficiency Mitsubishi Electric R32 split systems, using a range of internal units, from wall mount to ceiling mounted.
COOLING AND HEATING AVAILABLE FROM THESE R32 SYSTEMS
MANCHESTER BAKERY
CONDENSER & EVAPORATOR REPLACEMENT
This particular site already had a current running system, the condenser was in need of replacing, the initial installation took place in the week, using a crane to hoist into position onto a pre built structure, designed and completed by a local metal fabrication company for us. Final connection over a weekend with conversion from R404a gas to R448a to comply with legislation. The evaporator was lifted into position and mounted to the current fixing positions, a like for like model was purchased to make the replacement evaporator a smooth installation.
Local Crane company worked in partnership to complete the lift
MANCHESTER SUPERMARKET
Refrigeration & Ventilation
The sited had several issues with the refrigeration pack and also an issue with high ambient air for the internally mounted condensers, due to building control, the condensers could not be mounted external. The existing refrigeration pack controlled both low/high temperature systems, we identified that a split in refrigeration systems was required to move the customer forward and keep operational, a separate remote pack was installed for the high temperature refrigerated multipack cabinets, while a separate low temperature pack was installed for the display freezers, with summer months bring high ambient temperatures , especially with no fresh air source, we created one, design, supply, install of this fresh air system, with pre filters and inverter control for the fan to maximise efficiency.
Inverter fan control allowing seamless control
CHRISTIE HOSPITAL NHS
BESPOKE REFRIGERATED DISPLAY
The coffee shop in the catering department at The Christie Hospital required a replacement refrigerated display, design, building, and installation was carried out to fit the design brief, stainless steel frame, with multiple shelves, using LED lighting, with rear loading doors and front customer side sliding doors, giving energy efficiency with a closed display.
LIGHTWEIGHT ALUMINIUMÂ SLIDING GLASS DOORS



CHRISTIE HOSPITAL NHS
REPLACEMENT WATER CHILLER
This project started from a winning tender, the previous HVAC chiller had failed substantially and with the age, a modern replacement was required, but due to the old chillers location, a crane lift was not possible, manual dismantling was carried out of the previous chiller and new stainless steel pipe using press fittings were used to mount the new chiller in a different location some 70 meters away, providing future service and repairs with easier access.